This project involved major structural alterations to a Grade II listed property that was the former Finsbury Town Hall.

Extensive temporary works were required to support the Great Hall and Council Chamber while demolition and remodelling works were
executed to the ground and basement floors.

Seven dance studios were created over two floors to accommodate the Urdang Dance Academy.

The basement was fitted out with new shower, toilet and changing facilities. A twelve person passenger lift was installed over three floors.

The existing mechanical and electrical systems were upgraded to provide climate controlled dance studios.

The entire property was decorated throughout.